Moves per hour (one crane)–
Boxes per hour (all cranes)–
Time to unload 3,000 boxes–
Drag to rotate, scroll or pinch to zoom

Moves per hour

Terminals measure a crane by moves per hour: 3600 seconds divided by the average cycle time. A twin lift spreader carries two 20 foot boxes in one move, doubling the boxes for the same cycle. Ship productivity multiplies that by the number of cranes working the vessel.

This is a simplified teaching model. Real averages are lower than the ideal number because of hatch covers, lashing, waiting for trucks and repositioning the crane along the ship.

Try it: set one crane at 180 seconds per move in single mode. A 3,000 box exchange takes about 150 hours. Now try six cranes at 70 seconds in twin mode and it drops under 10.

Why the trolley path matters

The trolley travels farther to reach the outboard rows of a wide ship, which lengthens the cycle. That is one reason terminals invest in faster trolleys and longer outreach as ships get wider. The animation runs much faster than real time.