Clamp force needed–
Cycle time (simplified)–
Shots per hour–
Drag to rotate, scroll or pinch to zoom

Sizing the clamp

Clamp force is the pressure in the cavity times the projected area of everything the melt fills, including runners. Pressure in bar times area in square centimeters times 10 gives newtons; dividing by 9,807 gives metric tonnes of force.

Cavity pressure depends on the plastic, the wall thickness and the flow length. Thin, long-flow parts need far more pressure than thick, short ones, which is why molders often add a safety margin of 10 percent or more.

Try it: raise the projected area to 400 cm² at 800 bar. The clamp needed passes 320 tonnes, a large machine. Then cut cooling from 15 to 5 seconds and watch shots per hour jump from 171 to 327.

Cycle time

The cycle readout adds about 6 seconds for injection, packing, opening, ejection and closing to your cooling time, a simplified teaching estimate. Cooling time grows roughly with the square of wall thickness, so thin walls are the biggest lever for faster molding. The animation runs three times faster than real time.

How to cite this model

Avid Solutions International. (2026, November 11). How injection molding makes plastic parts [Interactive 3D model]. Avid Field Lab. https://avidsolutionsintl.com/explore/injection-molding

Last updated November 11, 2026

Keep exploring